OffenhamSkyBlue
Well-Known Member
The Heads of the Valleys road (A465) is a disaster zone from start to finish. Even the bit they finished before the EU money dried up has a 50 limit on a perfectly good, virtually empty, two-lane dual carriageway, for some bizarre reason (at least it isn't in the Welsh blanket 20 zone). And the bit they haven't finished around Brynmawr is like the surface of the f*cking moon!! I think they must have appointed the same contractor as the one supposedly "working" on the Stoneleigh junction! Clowns!Baking to death in direct sunlight/29 degree heat on the A465, behind a construction vehicle doing 14mph in a 40 zone for 4 miles (there was literally 40 cars behind him), and then finding the M4 rammed like a fajita later on. I was ready to pull someone’s head off by the time I got home.
I’m going the nice way to Merthyr Tydfil from now on, over the Brecon Beacons.